Hello. I’m Andrew Galea. Architect, builder and curious person. My work starts with buildings, but often leads elsewhere: into software, research, photography or a question I can’t quite leave alone. This is a place to bring it all together: a growing collection of work, observations and ideas, shared as they develop.Cover sheetMore about me
FFL 12.4021 June, 33°21 Dec, 80°A house for one, in three drawingsSection A, 1:100
Morning light on the west wallWest wall, 7.40 am, 14 June
115days, median, from lodgementto consent, across 412 applicationsHow long a development application really takesMedian days, lodgement to consent
FFL 12.4021 June, 33°21 Dec, 80°Drawing the sectionSection A, drawn in the order it is built
18 000SleepBathStoreKitchenLivingDeckAANA house for one, in three drawingsGround floor plan, 1:100
NCC 2022NCC 2025Moved or rewordedChanges a drawingNewWhat changed between NCC 2022 and NCC 2025Clauses matched across the two editions, schematic
1 190 / 2302 150 / 270A stair, sketched twiceTwo stairs, riser and going in millimetres
081012141618MonTueWedNothing dueThuFriNothing dueOn slowness in practiceA week, with seven hours where nothing is due
A-000A-001A-002A-003A-004A-005A-006A-007A-008A-009A-010A-011ArgueInstructThe drawing is the argumentA set of twelve sheets, in order
8 Jun9 Jun10 Jun11 Jun12 Jun13 Jun14 JunMorning light on the west wall7.40 am, 8 to 14 June
Roof 17.36FFL 12.40A house for one, in three drawingsNorth elevation, 1:100
Council’s clockClient’s clockunder 40115020406080100120daysHow long a development application really takesTwo clocks, median days

A portrait, July 2025

Photograph, 24 November 2026

A portrait, July 2025. Most of the entries here are drawings, research and notes about other people’s buildings. This one is of the person keeping them.

No. 2620 · Practice
First printing, printed
Record 4270aa0

  1. 1

Diazo, a PDF platform for drawings and their data

Essay, 24 November 2026

By the time a drawing reaches anyone outside the office, as a PDF, most of what the model knew about the building has gone. I’m building an application that brings it back into view: a place to review, mark up and sketch over a set, where each drawing also shows the data behind it, and where an AI agent can work on the same set. Its working name is Diazo by Alvar.

A new layer of detail

In No. 2617 I proposed that a drawing PDF carry the model’s data inside the file. Diazo is the application that reads it. Choose a door on a sheet and see its type, its leaf and clear opening, the wall it is set in, its room, and every other sheet it is drawn on.

From that data, quantities can be counted instead of measured, and a check against the National Construction Code can work from declared clear openings, risers and goings, each finding tied to its clause and to its sheet.

The drawing stays the drawing. Diazo still does what architects, engineers, estimators and certifiers need from a PDF: markups with a list and a status for each, measuring, comparing two issues of a set, and trace laid over a drawing to sketch on, all to scale. The data sits underneath, there when it is wanted.

The plugin

The data has to come from somewhere. Alongside the application I’m building the plugin that writes it: an exporter for Revit first, then for the other programs an office draws in. The data goes into each PDF as the sheet is printed, and the set is issued exactly as it is now.

For people and for agents

Everything Diazo does is open to an AI agent through the Model Context Protocol, with a window or without: in the application, beside the person using it, or on its own across a whole set. An agent reads the data first and uses the drawing to confirm it. It can answer a question such as which doors have less than an 850 clear opening, and on which sheets, without reading the linework the way a person does.

Where it stands

The foundation was finished on 14 November 2026: a viewer that opens large sets in the browser and stays inside a tablet’s memory, and eight markup tools that save into the PDF. Reading the data, the Revit exporter and the checks come next. The first public beta should review a set, take off quantities from the drawing and the data, compare two issues, sketch to scale, and export a data PDF from Revit.

No. 2619 · Documentation
First cut, in progress
Record 4270aa0

  1. 1
  2. 2
  3. 3

The Alvar typeface, sketched and drawn

Drawings, 24 November 2026

I think you can sense when something has been made with care, even if you can’t quite say why. When we began to think about how Alvar should look, that was what we wanted: not a typeface chosen from a list, but something made for it, with intent. So we started in the simplest possible place. With a single letter. An A.

It’s remarkable how much one letter can hold. Alvar’s A doesn’t quite close. The crossbar leaves the left stem almost flat, then falls away before it reaches the other side (Fig. 1). Everything else in the typeface is calm and resolved, and that is exactly what gives the A its voice. It asks you to pause, just for a moment, and in that moment you begin to notice the rest.

Once the A was there, every other letter had to belong to it. I sketched them by hand, one at a time: a light serif, with long, very fine hairlines and a small lower case, drawn to be seen large. The sketches are where the decisions were made. Everything after that was about staying true to them.

Turning a sketch into a precise letter is quiet, patient work. I drew each character with AI, one at a time, and it was never a single conversation. A letter would come back close, and close isn’t the same as right. So I would set it beside the sketch, try to describe what was wrong, and ask again. Most of the work lived in that back and forth, in the small differences that are hard to name but impossible to ignore.

There were surprises. Every drawing came back sitting on a grey and white chequerboard, the pattern we have all learned to read as transparent, except here it was painted into the image itself. So each letter had to be carefully lifted away from it before it could be used. By 1 June 2026 there were ninety-six of them: every capital, every lower case letter, every figure and mark.

The first version was finished on 20 June 2026. It had the capitals, the lower case, the figures, the marks of ordinary text, the pound and the euro (Fig. 2). What it didn’t have were accents. Type café, and you would get cafe. A small thing, but small things matter.

Version 2.000 came five months later, on 24 November 2026, and it turned a single font into a family. The original drawing became Alvar Light. From it, point by point, I made a Bold. The stems and round sides grew 2.2 times and the hairlines from 12 units to 20, just enough that the contrast between thick and thin, which is really the character of the whole thing, stays sharp. Serifs, joins, points and dots were each considered on their own, so that nothing fills in and nothing breaks.

Between Light and Bold sit Regular, Medium and SemiBold, a quarter, a half and three quarters of the way. Each has an italic, the roman leaned 12 degrees so that it matches letter for letter. Ten styles, and a variable font that holds every weight in between (Fig. 3). The accents are drawn now, so café is café, and the font has grown from 176 characters to 386.

The A has a twin now: a closed one, its crossbar meeting both stems, there if it’s ever needed. But the open A is still the default. It’s where all of this began, and it’s still the first letter of the name.

No. 2618 · Type
Version 2.000, in progress
Record 1c241cd

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Drawings that carry their own data

Research, 5 November 2026

Most of the work on AI and drawings teaches a model to read a PDF the way a person does. I’m researching another route. The PDF 2.0 standard lets a drawing carry structured data inside the file, so the BIM data behind each sheet could travel with it, for AI agents, estimators and checkers to read directly.

Most sets now come out of a model. At the moment a sheet is printed, the software knows every door on it: a 920 leaf with an 850 clear opening, type D-04, set in a fire-rated wall. The PDF keeps the lines and drops the rest. Everyone downstream then rebuilds it: the estimator measuring quantities, the certifier scaling off the sheet, and now a model reading the linework.

The obvious answer is to send the model. Usually it stays in the office, for good reasons: intellectual property, liability for information nobody meant to be relied on, software versions, file sizes, and work that is only half resolved. The PDF is what goes out, and that won’t change because a new tool arrives.

What the standard allows

PDF 2.0 is ISO 32000-2, published in 2017 and revised in 2020. The PDF Association has made it free to read since 2023. Its associated files let a PDF carry other files and say how each one relates to the content: Source, Data, Alternative or Supplement, among others. A file can belong to the whole document, to one page, or to a single object on a page. The archival versions allow it too: PDF/A-3 since 2012, and PDF/A-4f, which is built on PDF 2.0.

So sheet A-201 can carry a small JSON file, declared as the Data behind that page, listing each door, wall and room on it and the box each one occupies on the sheet. The drawing still opens like any other drawing.

Invoices already do this

European e-invoicing settled the same problem with hybrid invoices. A Factur-X or ZUGFeRD invoice is an ordinary PDF with the same invoice embedded inside it as XML. People read the page; accounting software reads the file; nobody changed how they send an invoice. Since 1 January 2025 every business in Germany has had to be able to receive e-invoices, and ZUGFeRD is one of the accepted formats. It comes in profiles, from a minimum set of fields to an extended one, so the sender decides how much goes out.

The industry has been close before. Autodesk’s DWF could carry object properties with a drawing, but you needed Autodesk’s viewer to see them, and PDF became the format anyway. The lesson from both is the same: put the data in the file people already use, and keep the standard open.

The proposal

An open standard and a set of open-source tools. An exporter for each BIM program writes the data as each sheet is printed. The drawing is issued exactly as it is now. A reader extracts and checks the data, and a Model Context Protocol server lets an AI agent put a question to a whole set, such as which doors have less than an 850 clear opening, and on which sheets.

The schema matters more than the code. It shouldn’t invent a new way to describe a building. Each record carries its IFC class and GUID, so it maps straight back to openBIM, and requirements can come from buildingSMART’s Information Delivery Specification, a final standard since 2024. The one new thing is the link from each record to its place on the sheet.

That would let a quantity surveyor price from quantities that arrive with the tender set, without the model. It would let a check against the National Construction Code work from declared clear openings, risers, goings and fire-resistance levels, with each finding tied to a sheet. An AI agent would read the data first, then use the drawing to confirm it.

What is still open

The drawing is the contract document, so where the two disagree the drawing should govern, and the file should say so, with a fingerprint of the page it describes. Embedded data can say more than a practice means to, so the exporter needs levels, as the invoices have. Printing again, flattening or merging a set can strip the file, so a reader has to notice when it is missing or stale. And the data is only as good as the model: a tag typed over by hand breaks the link.

Singapore has taken the model route, requiring IFC submissions for new projects since April 2025. This is for the rest: the projects where the model stays in the office and the PDF goes out. I’m thinking of releasing it as open source. If you price, certify or check drawings and have a view on it, I’d like to hear from you at hello@andrewgalea.au.

Sources: ISO 32000-2 from the PDF Association, its note on associated files, Factur-X and ZUGFeRD, buildingSMART’s IDS and Singapore’s CORENET X plan.

No. 2617 · Documentation
First cut, in progress
Record 4270aa0

  1. 1
  2. 2
  3. 3
  4. 4

Drawing the section

Film, 1 November 2026

A section is the drawing where a building admits what it is made of. A plan can flatter; a section has to show the floor, the roof and the sky in one line.

This film draws the section of the house in No. 2615 in the order I would draw it by hand: the ground, then the floor, the walls and the roof, then the sun. The angles are Sydney’s, at noon on the two solstices.

Watch where the winter line lands. The eave is set so it reaches five metres into the room in June, and so the summer line stops just short of the glass.

No. 2616 · Studies
First cut, in progress
Record 4e0097c

  1. 1
  2. 2
  3. 3

A house for one, in three drawings

Drawings, 30 October 2026

One room around a closed core. Everything wet and stored sits in the core, so the room around it can stay open to the north.

The plan sets out the room. The elevation shows how much of the north wall is glass, and how far the roof reaches past it.

The section carries the argument. The roof rises to the north, and its eave is set so the winter sun reaches the back of the room and the summer sun stops at the glass.

No. 2615 · Documentation
Revision B, for discussion
Record 4e0097c

  1. 1
  2. 2
  3. 3

How long a development application really takes

Research, 28 October 2026

A development application runs on two clocks. The council’s clock is written into the regulations and counts the days it has to decide. The client’s clock starts the morning the drawings are lodged and stops the morning consent arrives. This study measures the second, because that is the one that sets fees, finance and the first day on site.

Across the 412 applications tracked so far, the median client clock is 115 days. The council’s clock for the same applications reads under 40. Most of the difference does not sit where people expect it to.

Where the days go

Councils start counting when an application is accepted, which can be a week after it is lodged. Their clock also stops whenever they ask for more information, and starts again only when the answer arrives. A practice sees none of these pauses.

Those requests are where most of the missing weeks sit. Fewer than half of applications receive one, but when one arrives it adds a median of twenty-six days. Most ask for something the drawings already held, in a place the planner did not think to look.

What a practice can change

Two habits shorten the client’s clock, and neither is speed. Applications that began with a pre-lodgement meeting were decided nineteen days sooner. Applications that answered the council’s checklist on the cover sheet drew half as many requests.

Both come down to the same courtesy: deciding, before lodging, what the planner will look for first, and putting it where they will look.

No. 2614 · Approvals
Third revision, in progress
Record 4e0097c

  1. 1
  2. 2
  3. 3
  4. 4

Morning light on the west wall

Photograph, 30 September 2026

For a week in June I photographed the same wall at the same minute each morning. The light comes through a window across the room and lands as four panes, a little further along each day.

No drawing told me this would happen. It is the best thing in the room, and nobody designed it.

No. 2613 · Studies
Single sheet, printed
Record 4e0097c

  1. 1
  2. 2

The drawing is the argument

Essay, 16 September 2026

We talk about drawings as instructions: this wall, this height, this material. But long before a builder reads them, a set of drawings has to persuade. It persuades a client to commit, a council to approve, a lender to lend.

Persuasion and instruction ask different things of the same sheet. Persuasion wants one idea, stated early and plainly. Instruction wants everything, in an order a stranger can follow.

The best sets I know resolve this by sequence rather than compromise. The first sheets argue; the later sheets instruct; and nothing in the later sheets contradicts the argument made at the front.

No. 2612 · Documentation
First printing, printed
Record 4e0097c

  1. 1
  2. 2

A stair, sketched twice

Sketch, 2 September 2026

The first stair fitted the room and failed the code: a 190 riser with a 230 going, ten millimetres short of the minimum going for a stair in a house.

The second gives up some of the room for a stair that is easier on the knees: 150 by 270, nine risers instead of seven. Drawn side by side, the cost is most of a metre of floor, and you can see what it buys.

No. 2610 · Compliance
Single sheet, printed
Record 4e0097c

  1. 1
  2. 2

What changed between NCC 2022 and NCC 2025

Research, 12 August 2026

A new edition of the code arrives as a whole document, but a practice only needs to know what moved. This study reads the two editions clause by clause and sorts every change by who has to act on it: the designer, the certifier, the builder, or nobody at all.

Most changes fall in the last group. They are renumbering, rewording and cross-references that now point somewhere new. The few that matter are easy to miss among them.

It is settled for now, at its sixth revision. It will reopen when the next amendment is published.

No. 2609 · Compliance
Sixth revision, settled
Record 4e0097c

  1. 1
  2. 2

On slowness in practice

Essay, 19 June 2026

The decisions that shape a building are rarely the ones made quickly. They are made over weeks, in the back of a mind, while other work goes on: on the walk to the station, in the shower, in the minute before a meeting starts.

A practice can protect that time or spend it. Most spend it without noticing, because from the outside slow thinking looks the same as no thinking.

The practices I admire keep a few hours a week where nothing is due. Nobody checks what happens in them. The buildings are better for it, and so, I suspect, are the people.

No. 2607 · Practice
First printing, printed
Record 4e0097c

  1. 1
  2. 2